Sunday, December 27, 2009

Another cable bag


The last black cable  bag I made was to long it would have looked better with only three cables so iam making another one with only three cables I have a great lining fabric and a clasp around here somewhere. It is time to make another cabled bag though I think the next one will be starcrossed  cables I think.
-- Sent from my Palm Prē

Re: Merry christmas


Here is the baby one I made for lela it came out real cute. I only used size 11 cuz I forget to bring the smaller needles
-- Sent from my Palm Prē


raena graham wrote:

Merry Christmas,
 
That is great I am so glad that everything worked out well... I bet she will get lots of comlimants on the bag...LOL... I hope she keeps you busy with repeat business and new clients. Thats a good idea

On Fri, Dec 25, 2009 at 9:37 AM, Toni Smith <diva27406@gmail.com> wrote:

Merry christmas
Everything came out great daninelle said the bag was long but it was ok she was going to rock it! Amelia loved her vest and she was cool with the machine knitted ones she was like we now know what the machine can do.she is cool as a fan I don't know her from a can of paint but we talk like we known each other all our lives I amy make a vest for the vannah contest they are addictive I am making lela a pink one.
-- Sent from my Palm Prē




--
Be Blessed

Monday, December 21, 2009

Vest

I am contract knitting. I have made 1 vest already and I stared a second. The first is made out of peruvia quick. Very nice and so the second is cascade 220 but it is worsted so I was on my own the pattern we came up with it was going to be too small and she wants a total of three vest by this wednesday yes 12/23. So I made a swatch to get 30 " I need 156 needles but I only have 111 on my bond so I have to split it. I am on the tailend of the first 12" section have the 18" and the last 12" to go then I need to do it again and sew it together mettress stitch of course. I tried mock rib but it did not look right.

-- Sent from my Palm Prē

Pre happiness



-- Sent from my Palm Prē
I got a pre for christmas! I am so psyched! It is very similar to my centro so not much change. I am contract knitting so that money will go towards accessories! Well after a pandora bracelet. I need all who reads this to pray that I have enough yarn to comple my vest on the machine. And that I have a suitable yarn in the house somewhere to make a baby vest. Signing out from the pre!

Friday, December 11, 2009

Cabled Clutch by request







The black bag is 17" wide and 7" tall. The grey bag is 14" wide and 6" tall. The black bag is made with size 15 needles and thick and quick yarn. The grey bag is made with size 15 needles and recycled wool.

Tuesday, December 08, 2009

Crafting

the pic is of the bag someone wants to pay me to make can you believe it? she wants a black ruths cable bag. I am working hard to get it to her by sat morning I forgot I put pockets in the bag lining so the lining will be black and the pockets will be the colorful fabric. Only on row 4 and I already want my own in mustard yellow.

Tuesday, December 01, 2009

My work in action

Imade this for mekhi and when it was to small we handed it down still looking good

Friday, November 27, 2009

Getting his sleep on

he is knocked out I know when we get to the room he will be wide awake

Monday, November 23, 2009

Sunday, November 22, 2009

Precious

that was not a bad movie. Tyler Oprah and the director did a good job as if they need my approval. I didi not work out today huritng to bad from yesterday. i don't think raking leaves and level one of the 30 day shred go together. I will get back on the stick tomorrow. Lord willing.

Mommy daughter berets

Saturday, November 21, 2009

Level 1 day 8

man my chest hurts. I mean really bad . I was told that just means I was doing it right. Why was I not doing right before. Anyway workout done one more day to go.

Headband#2

I made another one l did not have any interfacing I like them with interfacing.

Friday, November 20, 2009

Level 1 day 7

not bad really did not want to workout but I was done before I knew it. Two more days on level 1.

Baby starcrossed beret

the pattern is working up wonderfully! not to far from the finish line. Working makes me too tired to knit in to the night like I am used to. So this hat is slow going. I am ready to start the everyway wrap but the 9's are busy.

Thursday, November 19, 2009

Level 1 day 5

way better than yesterday less shaky now made through all of circut 2 and 3 with no breaks decided not to do jump ropes instead do walking in place as fast as I can. so far so good.

Half wig accessories

I made a headband. Go me! It was not hard at all and I can't sew all that great. Can't wait to make another one!

Wednesday, November 18, 2009

Level 1 day 4

still hard did not meet goal took about two breaks in circut 1 try again tomorrow arms are still shaking.

It might be me

but my 2nd beret is going much faster than the first Ithink it is the needles the sts get stuck on the plastic needles.

Tuesday, November 17, 2009

T/J Project 4

today was better. Arms still shaking took about two breaks but later in circut 1 than before. Circut 1 is the hardest for me for me it get better after circut one my goal is no breaks during circut 1. when I first got this dvd I could not make it through the warm up. Baby steps.